Edge
Sign up Sign in RU
Economic calendar

Construction Spending m/m

USD Low Thu, 1 Oct, 14:00
How to read explanation, click to expand

Before the release: what happens to the currency if the figure comes out above, below or in line with the forecast. After it: the actual, the deviation and the reading for pairs. Below: past releases.

Releases at this time

EventPreviousThe previous is the value of the last release (sometimes already revised).ForecastThe forecast is what analysts expected before the release. The market prices the forecast in beforehand, so it is not the figure itself that moves the price but the gap from the forecast.ActualThe actual is the figure that came out. Green is above the forecast, red below.DeviationThe actual minus the forecast. The bigger it is, the stronger the move usually is.
Construction Spending m/m -0.5% 0.0% 0.9% +0.9% above
FOMC Member Waller Speaks no data
ISM Manufacturing PMI 54.6 54.8 54.5 −0.3 below
ISM Manufacturing Prices 71.1 72.9 77.9 +5.0 above

Past releases

First figure Forecast
PeriodReleasedFirst figureThe first figure is how the indicator came out the first time, before revisions. It is what the market saw at the release.ForecastThe forecast is what analysts expected before the release. The market prices the forecast in beforehand, so it is not the figure itself that moves the price but the gap from the forecast.DeviationThe actual minus the forecast. The bigger it is, the stronger the move usually is.
Sep 2026 02.11.2026 -1.9% 0.4% −2.3% below
Aug 2026 01.10.2026 0.9% 0.0% +0.9% above
Jul 2026 01.09.2026 -0.5%
Jun 2026 03.08.2026 -0.1%
May 2026 01.07.2026 0.1%
Apr 2026 01.06.2026 0.4%
Mar 2026 07.05.2026 0.6%
Feb 2026 08.05.2026 -0.2%
Jan 2026 24.03.2026 -0.3%
Dec 2025 28.02.2026 0.3%
Nov 2025 28.02.2026 -0.2%
Oct 2025 22.01.2026 0.5%

Above the forecast: 1 of 2

Actual

0.9%
+0.9% above
Received
01.11.2026 18:14
Series
Строительные расходы США

The forecast over time

ReceivedForecastThe forecast is what analysts expected before the release. The market prices the forecast in beforehand, so it is not the figure itself that moves the price but the gap from the forecast.PreviousThe previous is the value of the last release (sometimes already revised).
30.09.2026 11:210.0%-0.5%
Edge